• editor.aipublications@gmail.com
  • Track Your Paper
  • Contact Us
  • ISSN: 2455-5304

International Journal Of Civil, Mechanical And Energy Science(IJCMES)

Analysis of Optimum Bid and Contractor’s Effort in Obtaining Profit

Anak Agung Diah Parami Dewi , Dewa Ketut Sudarsana , Putu Ira Pramesti Wiraningsih


International Journal of Civil, Mechanical and Energy Science (IJCMES), Vol-8,Issue-4, July - August 2022, Pages 1-10, 10.22161/ijcmes.84.1

Download | Downloads : 10 | Total View : 816

Article Info: Received: 20 Jun 2022; Received in revised form: 15 Jul 2021; Accepted: 21 Jul 2022; Available online: 27 Jul 2022

Share

The government in Bali Province, Indonesia offers a limited number of projects, even during 2018-2020 it has decreased by 32% annually. The limited number of projects makes contractors compete to submit low-value bids. That phenomenon raises a question of what the optimal construction bidding for contractors is. A bid could be defined as optimum when it provides both of winning opportunity and the expected profit. Optimum bid analysis was carried out using the Friedman method, where it was discovered that the optimum value of construction bidding is in the range of 1%-9% mark-up or bidding at 76.21%-82.25% of the owner’s estimate. Based on a review of projects throughout 2021, only 19% of projects were won with an optimum value but the quality and quantity of the results remained good according to the agreed contract and was acceptable to the owner. The contractor needs to formulate efforts to maintain the targeted profit margin from the bid value that has been submitted. The factor analysis method is used to find the main factors that affect the profit margins expected by the contractor, where it is found that the Financial-Coordination Factor is the main factors that must be considered. The semi-structured interview method is also used to obtain the right implementation strategy in order to strengthen indicators related to Finance-Coordination factor, such as: smooth payment processing from the owner, good internal communication, safe environment, skilled workforce, proper site conditions, cooperation with suppliers, and good response from the community.

Bid, Optimum, Effort, Factor, Contractor’s Profit

[1] G. Nursetyo, “Game Review In Project Auction Rules,” 2016.
[2] H. Patmadjaja, “Bidding Strategy Model for Construction Projects in Indonesia,” Univ. Kristen Petra Civ. Eng. Dimens., 1999.
[3] Riswandi, M. Natalia, S. Satwarnirat, Z. Mirani, and M. L. Sapril, “Analysis of Factors Affecting Contractors' Profits on Building Construction Projects in Padang City 2018,” J. Ilm. Rekayasa Sipil, vol. 16, no. 1, 2019, doi: 10.30630/jirs.16.1.194.
[4] R. Atkinson, “Project management: Cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria,” Int. J. Proj. Manag., vol. 17, no. 6, 1999, doi: 10.1016/S0263-7863(98)00069-6.
[5] W. I. Ervianto, “Construction Project Management (Revised Edition),” in Yogyakarta: Andi, 2005.
[6] President of Indonesian Republic, “Presidential Regulation of the Republic of Indonesia Number 12 of 2021 concerning Government Procurement of Goods/Services,” 2021.
[7] President of Indonesian Republic, “Regulation of the Government Goods/Services Procurement Policy Institute Number 9 of 2018 concerning Guidelines for Procurement of Goods/Services through Providers,” Page. 35-37, 2018.
[8] President of Indonesian Republic, “Government Regulation of the Republic of Indonesia Number 40 of 2009 concerning Income Tax on Income from Construction Services Business,” 2009.
[9] Kurniawan, “Factors Affecting the Success of Policy Implementation,” Getok Tular. 2009, [Online]. Available: https://hykurniawan.wordpress.com/2009/07/30/faktor-faktor-yang-mempengaruhi-keberhasilan-implementasi-kebijakan/.
[10] S. Santoso, IT Based Business Solutions Series Using SPSS for Multivariate Statistics. Elex Media Komputindo, 2016.
[11] T. . Handoko, Management 2nd Edition. Yogyakarta: BPFE UGM, 2003.